I have a production order 987 which requires 256 KG of material component 123.
Material 123 has unrestricted stock in batch A with 220.068 and batch B with 360.000.
There was missing part due to other production orders and only 220.068 from batch A was assigned to the production order.
The other production orders were deleted and batch determination ran again for production order 987.
However, there is still missing part.
When I run availability check or batch determination, it doesn't automatically split batch and assign available stock from the 2 batches.
I tried to run CO06 to un-confirm the 256, and also manually remove the originally assigned batch A by clearing the field.
However, when I run batch determination, it only sets the committed quantity to 256 but no batch assigned.
This is a newly created material but I don't see anything different. Only difference is forecasting view is maintained which normally is not for other materials. Could this be the problem?