Hi.
Please help me if you all know any possible answer or workaround.
Regards
Aflal
Hi.
Please help me if you all know any possible answer or workaround.
Regards
Aflal
Please try these 2 solutions.
1. Change to delete at item level (MASSEKPO)
2. Please check your info record, is it still actually exist ?
Hi Kamal Sir
...option 1. If you want to show this cost separately as indirect OH cost like Prod Mgmt cost, QC cost, Admn cost and Maint cost then create 4 CCtr as Prod Mgmt OH, QC oh etc and plan in KP06 and finally allocate these cost to prod deptt through assessment cycle. In CCS also create 4 separate attributes and assign relevant CE to identify in prod cost
In the above option how the cost will be charged to the production? I believe through separate activity types, Right? If yes then those activities are also to be included in routings.
Regards
Rajneesh
please can you give more details on this?
are you checking in ESS portal for a particular employee? if that is the case check if you whether the work schedule rule has got the correct holiday calender id assigned?
is it happening only for only EE or for everyone?
is this a new implementation or old one which was working correct now & now it is not working?
Rajneesh
Other than Permlab and Temp Lab you have a common activity like OTH Activity...so within that all these will flow and through CCS will divide
what I am telling no separate activity is required for each of them
You are right that one OTH Acivity to be created...
So he has to create 3 activities
1. PermLab
2. Temp Lab
3. OHT Cost ( for all cost other than 1&2)
Then will separate them as I suggested
Kamal
Recently i have run SGEN on our DEV server.logs show everything fine but in st22 it show GEN_FRAGVIEW_EMPTY dump
Date | Time | Message |
04.03.2016 13:47:28 Job started
04.03.2016 13:47:28 Step 001 started (program RSPARAGENER8, variant &0000000000001, user ID abcd
04.03.2016 13:47:28 Task: Generate all objects of selected software components
04.03.2016 13:47:28 Data basis: all_components
04.03.2016 13:47:28 Control program of the parallel processing on host dqserver was started
04.03.2016 13:47:28 Server dqserver_DSR_00 is used during parallel processing
04.03.2016 13:47:28 Generation for machine type 562
04.03.2016 13:47:29 7 parallel jobs have been scheduled to generate 198,033 objects
04.03.2016 13:47:29 Each job processes 400 objects for one run
04.03.2016 18:33:55 Task 7 completed
04.03.2016 18:34:34 Task 5 completed
04.03.2016 18:34:47 Task 1 completed
04.03.2016 18:34:52 Task 6 completed
04.03.2016 18:35:11 Task 2 completed
04.03.2016 18:35:24 Task 4 completed
04.03.2016 18:36:24 Task 3 completed
04.03.2016 18:36:25 Detailed information on parallel processing -> Spool -> Display contents
04.03.2016 18:36:25 Job finished
Dear Divya,
Outlook is not integrated to Resource scheduler. You may consider an option to create visits for the tickets in the system. The visits will show up on the outlook calendar after sync so long the user is responsible for those accounts.
Best Regards,
Pragya
Hello Chetan,
Indexing is done to search for messages which are processed in PI before configuring the UDS.
So if you do it once all the messages processed before will be also filtered using UDS.
But for messages sent after configuring the UDS, no need of indexing.
Also make sure ur UDS is active.
Hello UWEM,
When the Call is successfully made from DEV,QAS should not be an issue. Both the boxes are in same SP and same patches in both?
Make sure the certificates are imported same like DEV.
I guess some setting is missed in Quality which is done in DEV. Cross check with basis once.
Hello Husain,
I think you should use the HTTP_AAE Adapter, it's available since 7.3 version, I suggest you to create an HTTP to File Synchronous Scenario.
HTTP <---------------------------- SAP PI
HTTP --(Bank Response)--> SAP PI --(FETCHING FILENAME)--> FILE
Chek below links:
HTTP_AAE Document:
http://scn.sap.com/docs/DOC-44764
Example:
Saludos Cordiales !! Adalid.
hi all...
i need to get all the controls (st_1,st_2,rr_1,rr_2,gb_2) which are used in datawindow (dw_1)
can any1 pls help me
with regards
delna
There are some issues with SUM 1.0 SP16 PL2 which SAP is fixing it.
Try PL1 or wait until they release new PL.
Regards,
JC
thanks for your reply
but conditions are not active in service entry sheets! Does it have any special customizing?
I just can enter surcharge condition in PO.
Hi,
BGD process are all free , nothing is running on the system and job RDDIMPDP is scheduled on the system .
I already tried to schedule and execute it again , but no luck. Reg. STMS, we removed the configuration and configure it again , but same error.
Do you have any other idea?
Thanks a lot, Carolina
Check if you have activated all the OData services mentioned here - Activating SAP Gateway OData Services - User Interface Add-On for SAP NetWeaver - SAP Library
Thank you Mustafa for looking into this. Here are my inputs-
1. I am changing the variable value on standard variable prompt dialogue appears on executing the application.
2. Using the code list box displays all the variable names exactly as passed inside APPLICATION.setVariableValueExt function including few variables which are defined as optional in HANA view and hence have not initialized at design studio. The dashboard works if ran without providing values to optional prompts and with parameters 001 and 003 for fiscal period range.
3. I was using APPLICATION.setVariableValue function earlier but while executing the dashboard it was throwing unhandled exception error hence I had to replace this function with APPLICATION.setVariableValueExt. and then I was able to run the application with no exception error.
4.I tried using DS_1.setVariableValue(Variable,Value) and DS_1.setVariableValueExt(Variable,Value) but its giving same unhandled exception error.
Thanks & Regards,
Jiten
Hi Abhnav Tyagi,
We are planning to migrate the SAP BW sytem to HANA.
Is it mandatory that our BO system too needs to be migrated?
We are in SAP BI 4.1 SP 4(Enterprise) with 100 users only.
Is there any criteria/rules to move the CMS system from traditional DB to HANA DB?
Hi Singh.
1. SAP system kernel level is very old. you have to upgrade the kernel from NW 7.00 level 146 to 7.20 ext version based on SAP Basis SP level.
Refer the SAP Note
1636252 - Installing a 7.20 kernel in SAP Web AS 7.00/7.01/7.10/7.11
2. After that start the SGEN.
Regards
SS
hello Team,
We are in the middle of s4HANA conversion 1511 on premise edition. We are facing issues in execution phase
Severe error(s) occurred in phase MAIN_NEWBAS/PARRUN_FILL_EXTRACT_S4!
Last error code set: No new lines found in logfiles. 1 error during parallel execution of processes, check 'PARRUNMATDOC1.ELG' for details 2 processes failed, check 'PHASEPARRUN.*' for details
I checked Default profile for DIR_TRANS and DIR_PUt , both pointing to ../../SUM/abap directory only.
I checked the logs and jobs and one of jobs is failing with error
NSDM_MIG_FILL_EXTRACT_01 - job
Error : settings for material number conversion not found
Please provide your valuable suggestions.
//Veeramalla