Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8594

Re: Base Unit of Measure in ECC and APO is different

$
0
0

Hi,

I have did following steps to delete material from APO

 

In APO-Product master,

 

1. Delete Planning version perameter (i.e. 000, 001..etc)

2. Deactivate material code from "Assign model"

3. I have tried to delete from "Delete Profile" BUT it is not responding

 

I have checked Product master but Master data which was maintained previously remained same, no changes has been done and also CIF material from ECC to APO..but unit of measure not changed as per ECC.

 

Pl. suggest is there any missing activity which needs to do ?

 

Pradipta Sahoo/Rajesh Mehta


Viewing all articles
Browse latest Browse all 8594

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>