Hi Prabhakar,
Without BW you cannot have BPC NW. The flow of data is from ECC -> BW -> BPC cube. The data that we save in BPC cubes are stored in BW under a separate namespace(/CPMB/). Hence the integration of BPC with ECC without BW is not possible.
Regards,
Kalyan.