Quantcast
Channel: SCN: Message List
Viewing all 8594 articles
Browse latest View live

Re: Count by given date range

$
0
0

hi Venkatesh,

 

if you're using a Command object then you should write your selection in the Command's WHERE clause.

 

if you use a Record Selection Formula on top of a Command, then all of your records will be returned from the database and then the filtering will be done in crystal reports. this will be slow.

 

-jamie


Re: SSO with Analysis for Office using OLAP on BI LaunchPad?

$
0
0

Thanks for your answers Josh and Seb.  So it is kind of SSO...but not really.  Plus it looks like you do not have control of the URL that is populated on that sign-on screen.  Thus not end user friendly and not ready for prime time. 

 

I have also tried tweaking the BOESystems.xml file to no avail.

 

This is very bad news and I hope SAP will rectify this in the near future.

 

Kindest regards,

Kelly

Creating Entirely new logic for fair share deployment in SNP

$
0
0

Hi Gurus,

 

I have a requirement where in the fair share logic is extremely complex

The system has to consider stocks at Plant, RDC,DC and distributor

Then carry out a complex calculation

For a each SKU calculate the  (Target Stock - Actual Stock) at DC,

Then compare it with the stock of the SKU at plant.

Based on this how much to be sent as fare share logic.

Is it possible to carry out such calculations ib SNP where we deal with order series and aggregates.

 

Thanks in advance

 

Vikas

Re: The wish you a happy christmas thread

$
0
0

I personally prefer The Grinch and Ebenezer Scrooge, especially as it hits me twice every year, nevertheless Merry Christmas and a Happy New Year from me too.

Re: Price Discount Flat Rate

$
0
0

Dear Ganesh,

 

I can go with an option of using two condition types: a fixed amount (for charging the flat rate)  and scale condition type ( for  further price slabs).

 

Regards,

Karna J

Re: Automatic entry of measuing points during good receipt of materials

$
0
0

Dear Pramod,

You can create a counter  (measuring point) and assign this counter to the PRT (provided that PRT shall be created as an equipment with PRT category).

Now you have to use a suitable enhancement (BAdI / user exit)  to update this counter upon each material inspection.

Then create a task list (either general / equipment). And assign MIC to the tasklist operation & assin inspection point 300 to tasklist header.

Then create a counter based inspection plan which will trigger calibration order on every 1000 count.

Then schedule this maint. Plan & do deadline monitoring in background if required.

This will create calibration order on every 1000 inspectins, release order, which in turn will create inspection lot.

Do result recording for this inspection lot, make ud.

Then TECO the order, then settle the order if any cost associated with it.

Maintenance plan & measuring point shall be directly assigned to PRT master data (Tcode = IE25 create / IE02 change), in tab strip PRT data, for calibration purpose

Regards,

Vinod.V

Re: Restore full backup only

$
0
0

Hello

If you want to recover the database to a point in time the restore all the archived logs until that time.

sqlplus "/as sysdba"

startup mount

recover database until time ‘YYYY-MM-DD:HH:MM:SS’ using backup controlfile;

 

Regards

RB

Re: System status based on MIC: UD ICCO & LTIN

$
0
0

Hi Craig,

Thanks for clearing my query. It is really a nice explanation.

 

This is basically a steel industry where liquid metal casting is done and variations are really common after the casting. This is the reason my client need this flexibility, to maintain the precise chemistry.

 

Thanks

 

Gaurav


Re: logic to pick the  material number which is relevant to equipment number (EQUNR field) in ie02

$
0
0

Mastan,

I guess you are searching for a where-used list for the PRT's in the routings.

Try the following:

1. CRVE_B-EQUNR = equipment number, CRVE_B-OBJTY = FH, extract CRVE_B-OBJID.

2. If you want to see only routing assignments, PLFH-PLNTY = 'N', PLFH-OBJID = CRVE_B-OBJID. Extract PLFH-PLNNR, PLFH-ZAEHL.

3. Access MAPL using PLNNR and ZAEHL.

 

Good Luck,

Rajen

Re: Employee Timesheet not displaying in Approve timesheet tab of Manager

$
0
0

Hi Teena,

 

Thanks for your reply. If relationships are there, there is no problem at all. This process would have been so simple. This is now not possible here. This is why we have used the Ztable to trigger the timesheet. The agent determination part which we have modified is perfectly working. The only problem is the request is not shown in the portal. For portal, we are using the standard webdynpro component. There is no UWL/POWL available here. Now the question here is how do we bring that work item which is pending with the manager to his portal. I have a few pointson this:
1. We use the standard Webdynpro component. What is the impact if we modify this?

2. Can we use a new Webdynpro component for this approval process? Wher in we will fetch the status 20 records and show in the approval tab and once he approves, the status will be 30?

3. Can we configure UWL only for this country and link the pending records from CTASDB to this?

Re: No material item found for the specified criteria Message no. HUGENERAL042

$
0
0

Hi,

 

I was able to get past this error. There are a variety of possible reasons which can cause this and other errors when trying to PGI/PGR using the IDOC.

 

Please review the POSNR value and quantities in E1EDL24 and E1EDL44 segments.

 

You wrote you are trying to go a PGR. Are you trying to post a Return to complete the PGR?

 

If so, there is no need for E1EDL37 and E1EDl44 segments since they are for packing and HUs.

 

If you can include photos of all your segments, I can review the data and hopefully can tell you what is wrong.

 

Thanks.

Re: Price Discount Flat Rate

$
0
0

Thanks  Karuna for ur Reply,

 

However if I Opt for Fixed amount , I get the discount of 5000 for 1 Order and the 5000 is getting splitted by the Number of Qty in that sames Order.

 

Sales Order A with 1 line item  with 7 QTY , The reaction : Discount  is  =5000/ 7. ( 5000 remains as fixed Qty in this case )

 

Any other correction welcome.

Re: EHP5 to EHP7 Upgrade: Preprocessing error MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC

$
0
0

Hello

2EETW000 key field T7AEPBS22-ITEXT contained the value 'Actions                  ': key field T7AEPBS22-ITEXT missing, key is truncated.

2EETW000 key field T7AEPBS22-SUBTY contained the value '8G': key field T7AEPBS22-SUBTY missing, key is truncated.

2EETW000 key of table T7AEPBS22 (0000000Actions                  8G) only valid up to offset 14 (in bytes). It's better to skip it.

2EETW000 key field T7AEPBS22-SUBTY contained the value '0450': key field T7AEPBS22-SUBTY missing, key is truncated.

2EETW000 key of table T7AEPBS22 (0002001                         0450) only valid up to offset 14 (in bytes). It's better to skip it.

You need to follow this SAP note.

1881193 - LOCHRSAE: Error during SP24 Implementation

There is an attachment in the note and you may refer to that.

You need to first unlock the SAP system to do that.

Refer to this SAP note to know how to unlock the SAP system.

1901463 - How to unlock the SAP system to perform correction(s) during an upgrade.


Regards

RB

Re: Linear Asset management

$
0
0

Dear Kashimawo,

Since you are not interested in activating LAM, we have to create as a point asset.

There is an alternate solution which is not straight. You have to divide this linear asset to discrete sections depend on GIS coverage.

Let us take the example of linear pipeline of 1000KM long, and each 100 KM there is GIS sensors.

We can create this 1000KM long pipeline as a point asset. Then each section of 100KM shall be created as sub equipment to to this main equipment.

Now the GIS in each 100KM, shall be integrated to the corresponding sub equipment.

So the maintenance activities will be performed on this sub equipment.

This is not the right way but alternatate way to achieve.

But i would personally suggest to activate LAM & Integrate GIS to SAP.

Which is the correct & complete solution.

Regards,

VINOD.V


Re: Is shell creation still necessary?

$
0
0

No, shell creation will not be removed from the scenario list. Many customers are using it as it is really useful if sender system contain lots of application data and repository of sender and receiver is not in synch. Regarding time, shell creation basically uses system copy functions plus TDMS logic to cut off the client specific application data, so import export will take really very less time but yes it may take more time as compared to DB clone.


Load data in HANA from BW Query

$
0
0

I want to load the BW Query result into a seperate HANA box. Apart from mocing this result into an excel and then laoding as CSV file, is there any other option? Can I have some kind of connection between the BW Query and HANA?

Re: Servlet [default] will be unavailable for undefined time.

$
0
0

Thanks Rishi for quick response.

 

I'm working with basis team to troubleshoot this issue according to your advise.

 

Will get back to you.

 

Thanks, Dinesh.

Re: Solman cant connect to SLD

$
0
0

Hi Sriram,

 

I am using our solman to execute the sldcheck and below is the error

 

Use transaction SLDAPICUST if you wish to maintain the SLD server access data

Launching the SLD GUI in a separate browser window...

=> Verify in the browser GUI that the SLD is in a healthy running state!

 

Calling function LCR_LIST_BUSINESS_SYSTEMS

Retrieving data from the SLD server...

Function call returned exception code     4

=> Check whether the SLD is running!

 

Summary: Connection to SLD does not work

=> Check SLD function and configurations

Re: Problem saving CR layout using SAP B1 9.0 and Crystal Report 2011 Integration Add-in

$
0
0

Hi Ian

 

I followed these steps and it works on my own computer.  I installed from the latest SAP Patch level Packages folder, SAP Business One 9.00 PL08 UPGRADE\Packages\Crystal Server Integration\BusinessobjectsRuntime32\setup.exe followed by SAP CRAddin Installation\SAP Business One Crystal Report Integration Package.exe.

My computer is Windows 7 32bit working as SAP Server and Client, Crystal Report version 14.0.4.738

 

 

 

Kedalene Chong

Re: certification

$
0
0

abap certification 80 ques only...

Viewing all 8594 articles
Browse latest View live




Latest Images